OUR PROJECTS
Together we create your happy place.
Hillcrest
7 months
Built Swimming Pools, Landscape Garden, Kitchen Cabinet, Interior refurbishment, Loose Furniture, Electrical Wiring, House Tiling works, Air Conditioning works.
KLIA Control Tower
6 months
Toilet refurbishment includes tiling and all bathroom Sanitaryware, Rest Room refurbishment inclusive Flooring, Ceiling, Kitchen Pantry and Loose Furniture.
Mercedes Benz
1.5 months
Epoxy Flooring, Internal Feature LED Walls, Painting, Reception Table, Blackout Curtains, Sounds System and Signages.
Montessori C180
1.5 months
Design and built, Adjoining 2 Office Space into 1, Overall Vinyl flooring, Electrical, Plaster Ceiling and partition.
Platinum Arena
1 month
Full House Built Ins, M&E Electrical, Plaster Ceilings, Tiling, Epoxy Flooring, CCTV.
Sierra 6 Puchong
1 month
Kitchen Carpentry, Bedroom Feature wall and Fixed Built in Carpentry works, Back Awning and Feature Tiling, Metal Grille works and All Electrical and Wiring works.
Skinny Dip
2 weeks
Design and Built Consultancy works.
USJ 17 Residential Corner Unit
12 months
Extension of House, Structural Demolition, Roof Works, Kitchen Extension, Garden Beautification, Porch Extension, Kitchen Cabinetry, Toilet Renovation, Paint Job, Electrical Wiring Works, Ceiling Modification Works, Overall House Tiling Works.
Za Altera
5 days
Vinyl Flooring, M&E electrical works, Feature Signage, Carpentry works and Plaster Ceiling Works.
Let us create your happy place.
Together.
We provide highly creative and modern interior design solutions for commercial and residential spaces with a classic touch to meet their demands and expectations.