Renovation & Interior Design FAQs
Yes. We produce 3D renderings so you can visualise the finished space before any construction begins. This is included as part of our design-and-build process.
Yes. We can provide architectural and engineering drawings. Where required for Majlis or DBKL submission, we prepare and submit the relevant documentation on your behalf.
Yes. Works that require formal approval - such as building extensions, structural changes, and office fit-outs regulated by local councils or DOSH - need permits before works begin. We manage the full submission process, from plan preparation and authority liaison through to permit issuance, coordinated alongside the physical works.
Any changes to the original scope are documented as a Variation Order (VO). We will advise you of the cost and time impact before proceeding. Approved VOs are added to the contract to keep everything transparent and agreed in writing.
Yes. We are a CIDB-registered Grade G4 contractor, which certifies us to undertake projects with contract values up to RM 3 million. You can request our CIDB registration details during consultation.
We serve the entire Klang Valley including Petaling Jaya, Subang Jaya, USJ, Puchong, Kuala Lumpur, Shah Alam, Klang, Cyberjaya, and Kajang. Our office is based in Petaling Jaya, Selangor.
We do not offer credit terms. Payment is structured in progress-linked stages tied to project milestones, which is standard practice for design-and-build contracts in Malaysia.
Yes. We offer a free initial consultation and free estimate costing for your project. Contact us to schedule a visit to your space or our showroom.
Custom kitchen cabinetry typically takes four to six weeks from measurement to installation. This includes the design sign-off period, fabrication, and site installation. We use solid materials with moisture-resistant finishes suitable for the Malaysian climate.
Yes. We handle the full submission process with the local authority (Majlis or DBKL) including application, documentation and follow-up so you do not need to manage it yourself.
Our contracts follow a milestone-based payment schedule - typically a deposit on signing, a second payment at commencement of works, progressive payments at key stages, and a final retention payment upon handover. The exact schedule is agreed upfront and stated in the contract.
Renovation costs vary widely depending on scope, materials and property type. As a guide, a standard landed terrace house (1,000-1,500 sqft) typically ranges from RM 80,000 to RM 200,000 for a full interior renovation. Condominiums tend to range from RM 60,000 to RM 150,000. We provide a detailed breakdown after the free consultation so you know exactly what you are paying for.
Duration depends on the scope. A standard internal renovation for a 1,000 sqft home typically takes three to four weeks. Larger or more complex projects such as full gut-and-rebuild, commercial fit-outs, or extension works can take two to six months. We provide a project schedule before works begin.
We do not offer fixed packages. Every project is designed around the client's goals and budget, which allows us to deliver a tailored result rather than a one-size-fits-all package.
We provide a 12-month Defect Liability Period (DLP) from the date of handover. During this period we will rectify any defects in workmanship at no additional charge.