Sun Synergy Contracts Logo
Hillcrest renovation by Sun Synergy Contracts

Hillcrest

Petaling Jaya, Hillcrest Duration: 7 months Completed: 2022

Project overview

The Hillcrest bungalow project is among the most expansive residential renovations we have completed. Over seven months, the team transformed every aspect of the home: custom kitchen cabinetry was designed and fabricated in our workshop, the entire interior was refurbished including all flooring, ceilings, and feature tiling, loose furniture was supplied and installed, the electrical system was fully rewired, and air conditioning was fitted throughout. The project also included full pool construction and landscaped garden works. Every element was managed by a single contractor team, giving the homeowners a seamless experience from demolition to final handover.

Scope of works

  • Full swimming pool construction with tiling and pump system
  • Landscape garden design and installation
  • Custom kitchen cabinetry fabrication and fitting
  • Full interior refurbishment including flooring and ceilings
  • Loose furniture supply and installation
  • Complete electrical rewiring
  • House tiling throughout
  • Air conditioning supply and installation

Project details

Location
Petaling Jaya, Hillcrest
Duration
7 months
Year
2022
Property type
Bungalow

"Sun Synergy Contracts transformed our home from top to bottom. The pool and garden exceeded everything we imagined."

- L.K., Petaling Jaya
Start a similar project

Project photos

Gallery

Like what you see?

Contact us to discuss your project. We will assess your space and provide a full itemised quotation with no obligation.