Sun Synergy Contracts Logo
Mercedes Benz renovation by Sun Synergy Contracts

Mercedes Benz

Kuala Lumpur, KL City Centre Duration: 1.5 months Completed: 2022

Project overview

A Mercedes-Benz showroom demands a finish level that reflects the brand it represents. The Kuala Lumpur fit-out required strict adherence to Mercedes-Benz brand guidelines across every surface and detail. Epoxy flooring was laid throughout the showroom floor, internal LED feature walls were designed, fabricated, and installed to spec, interior painting was completed to brand colour standards, a custom reception table was built in-house, blackout curtains were fitted, a professional sound system was integrated, and all signage was fabricated and mounted. The full scope was delivered in six weeks, on time for the showroom's scheduled opening.

Scope of works

  • Epoxy flooring installation throughout showroom
  • Internal feature LED wall design and installation
  • Interior painting to brand specification
  • Custom reception table fabrication
  • Blackout curtain supply and installation
  • Sound system integration
  • Signage fabrication and installation

Project details

Location
Kuala Lumpur, KL City Centre
Duration
1.5 months
Year
2022
Property type
Shop / Retail
Start a similar project

Project photos

Gallery

Like what you see?

Contact us to discuss your project. We will assess your space and provide a full itemised quotation with no obligation.