Montessori C180
Petaling Jaya, C180 Duration: 1.5 months Completed: 2022
Project overview
The Montessori C180 project required combining two side-by-side office units into one cohesive, child-friendly learning space. Partition walls were reconfigured to create an open-plan layout, new vinyl flooring was installed throughout, plaster ceilings were fitted, and electrical points were repositioned to suit the new interior arrangement. Internal partitions were built to delineate activity zones while keeping the space feeling open. From first site visit to handover, the entire project was delivered in six weeks, allowing the centre to open on schedule.
Scope of works
- Structural merging of two office spaces into one open-plan unit
- Full vinyl flooring installation throughout
- Electrical works and power point layout
- Plaster ceiling installation
- Partition wall construction and finishing
Project details
- Location
- Petaling Jaya, C180
- Duration
- 1.5 months
- Year
- 2022
- Property type
- Office