Sun Synergy Contracts Logo
Sierra 6 Puchong renovation by Sun Synergy Contracts

Sierra 6 Puchong

Puchong, Sierra 6 Duration: 1 month Completed: 2023

Project overview

The Sierra 6 project centred on elevating the interior of a Puchong condominium with high-quality carpentry and finish work. Custom kitchen cabinetry was designed and installed, bedroom built-ins were fabricated to specification, a feature wall added design interest to the main bedroom, a back awning with feature tiling extended the usable space, and metal grille work was fabricated and fitted throughout. All electrical and wiring works were completed in parallel, with the entire project handed over within a single month.

Scope of works

  • Custom kitchen carpentry design and installation
  • Bedroom feature wall with built-in carpentry
  • Back awning construction with feature tiling
  • Metal grille fabrication and installation
  • Full electrical and wiring works

Project details

Location
Puchong, Sierra 6
Duration
1 month
Year
2023
Property type
Condominium
Start a similar project

Project photos

Gallery

Like what you see?

Contact us to discuss your project. We will assess your space and provide a full itemised quotation with no obligation.